Composed of 4 wooden structures of approximately 600 to 700 kg, this footbridge is dismantled every autumn by helicopter and assembled at the end of spring. It provides hikers with access to the heart of the Vanoise National Park by allowing them to safely cross the Savinaz stream which is impassable in times of high flows. The footbridge was also designed to allow access to the farmer’s pastures and his herd of heifers.